Overnight Crane Assembly at Oakwood Station - May 27, 2021

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
May 27, 2021

Overnight Crane Assembly at Oakwood Station May 27, 2021

What Work is Taking Place?

On Thursday May 27, 2021, crews at Oakwood Station will work overnight to assemble a crane at the Main Entrance site. This work is being performed in preparation for the escalator installations taking place on Friday May 28 and Saturday May 29. Minimal noise is expected, while this work takes place. 

What to Expect

A crane will be assembled overnight the Main Entrance of Oakwood Station. Minor overnight noise from construction activity can be expected. Expect delays while travelling through the intersection.

HOURS OF WORK

  • Work will take place overnight from the evening of Thursday May 27 to the morning of Friday May 28, 2021
  • Work may be rescheduled due to inclement weather or unforeseen circumstances

TRAFFIC DETAILS

  • No changes to the current traffic configuration are expected while this work takes place
  • Times Road will remain closed

PEDESTRIAN DETAILS

  • There are no changes to current pedestrian routes associated with this work

TRANSIT INFORMATION

  • Access to TTC will be maintained at all times
  • Please visit www.ttc.ca for more information

 

Disponible en français.

Sign up for e-mail updates at www.thecrosstown.ca/sign-up