NEW DATES: Road Resurfacing and Fresh Line Painting Work - Bessborough Drive to Hanna Road - (Overnight Lane Reductions)
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
Choose an intersection (A to Z)
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
October 10, 2018
PREVIOUSLY POSTED: SEPTEMBER 24, 2018
What Work is Taking Place?
On October 12, 13 and 14, Eglinton Avenue East will be reduced to one lane, with two-way traffic facilitated by traffic control personnel between Hanna Road and Bessborough Drive.
Crews will re-surface the road decking and refresh lane markings in this area.
Timing
- Work will take place over three (3) nights - October 12, 13 and 14.
- Work will occur between 9:00 p.m. and 7:00 a.m.
- Work may be rescheduled due to weather conditions or unforeseen circumstances.
What to Expect
Pedestrians, businesses and residents near the work site can expect to hear trucks, removal and replacement of existing line paint, movement of concrete barriers and fencing, and other construction equipment.
Categories: