Laird Drive
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street

Crane Installation at Laird Station Main Entrance
A large tower crane will be delivered and installed at the Laird Main Entrance during the week of July 3rd.
What to Expect Read more »
Laird - Leaside Construction Liaison Committee Meeting
The construction liaison committee meeting of Leaside and Laird Stations was held on June 14, 2017. You can see the presentation here:
Gas Main Support at Laird Station
To prepare for upcoming mining operations at Laird Station, micro piles will be drilled to the north of the Laird Station Secondary entrance. Micro piles will support local gas mains during mining.
Hours of Work/ What to Expect Read more »
Mining at Laird Station
The Eglinton Crosstown includes a 10-kilometre underground portion, between Weston Road and Laird Drive, where 15 below-grade stations are under construction. Eleven will be built using a “cut-and cover” method and four, including Laird Station, are going to be “mined.”
Excavation of the secondary entrance at Laird Station is complete and mining will begin soon. Read more »
Site Trailers and Crane Installation at Laird Station Secondary Entrance
Four site trailers and a crane will be delivered and installed at the Laird Station Secondary Entrance.
Hours of Work Read more »
Update: Monitoring Equipment Installations and Readings at Laird Station
What Work is Taking Place? Read more »
Update: Tunnel Concrete Pour for Laird Station
To progress construction at Laird Station and prepare for upcoming mining works, crews will be drilling from the right of way surface into the completed TBM tunnel to fill portions of the tunnels with concrete.
Hours of Work Read more »
Ongoing Preparatory Works between Brentcliffe Road and Midland Avenue: Street Furniture Removals SPRING & SUMMER 2017
What Work is Taking Place?
As part of ongoing preparatory works, crews will begin the process of removing street furniture across the Eglinton Avenue East corridor between Brentcliffe Road and Midland Avenue. Read more »
Shoring and Excavation Work Continues for Laird Station: Long Term Sidewalk Closure
Since June 2016, shoring and excavation work has been underway within the main and secondary entrance sites for the future Laird Station. Read more »
Update: Material and Equipment Deliveries at Laird Station
During the week of April 24 and May 1, there will be a number of large equipment and material deliveries to the Main Entrance at Laird Station. To safely offload equipment and materials into the bottom of the shaft temporary lane and sidewalk closures will be in place as required. A mobile crane will be used to facilitate deliveries.