Crane Replacement Laird Main Entrance
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
Choose an intersection (A to Z)
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
June 19, 2019
The large tower crane currently in place at the Laird Main Entrance will be removed and replaced with a new crane. This work will take place for approximately 5 days between June 24th, 2019 and June 28th, 2019.
Throughout the 5 days of work there will be 2 to 3 one hour periods per day when Laird Drive will be fully closed between Parklea Drive and Eglinton Avenue E. This will occur during off-peak travel times. The sidewalk on the south side of Eglinton and the north/south crosswalk on the west side of Laird will also be closed during the one (1) hour period
HOURS OF WORK
- Work will take approximately five (5) days.
- Work is planned for June 24th to 28th. Alternate dates are between June 28th and July 12th.
- Work will occur between 7:00 am to 11:00 pm
- Full closures of Laird Drive will occur outside of peak travel times.
TRAFFIC AND PEDESTRIAN IMPACTS
- Laird Drive from Eglinton Avenue to Parklea Drive will be reduced to one lane in each direction.
- During one (1) hour periods, 2 to 3 times per day there will be a full road closure on of Laird Drive between Eglinton Avenue East and Parklea Avenue and the sidewalk on the south side of Eglinton and the north/south crosswalk on the west side of Laird will also be closed
- Existing pedestrian walkway closures at Laird Drive and Eglinton Avenue East remain in place.
- Paid Duty Police Officers (PDO) and/or traffic control personnel will be present.
- There is no impact to existing TTC stops.
TRAVELLING SMART DURING CONSTRUCTION
- Travel delays are expected with construction. Please allow extra time for your journey.
- Traffic will be extra heavy at peak periods during the Eglinton Crosstown LRT construction.
- Download the free ‘aCrosstown’ traffic app to get real-time traffic and transit information for Eglinton Avenue.
Disponible en francais
Categories: