East At-Grade Town Hall Meeting

Our town halls provide information on construction impacts on Eglinton Avenue East between Credit Union Drive to Ionview Road feature detailed project maps and imagery. You can see the presentation here:

Read more »

February 212019

Temporary Crosswalk Closure at Credit Union Drive

Temporary Crosswalk Closure at Credit Union Drive

WHAT WORK IS TAKING PLACE? Read more »

February 192019

New Traffic Configuration: Wilson Brook Culvert East of Sloane Avenue

ORIGINAL POSTING: FEBRUARY 1, 2019

WHAT WORK IS TAKING PLACE?

Work on the Wilson Brook Culvert has been underway since late August 2018 on Eglinton Avenue East. Crews are building a temporary storm drain line, as well as excavating and replacing the storm water culvert under Eglinton Ave East. 

February 152019
January 112019

New Traffic Configuration: Eglinton Avenue East between Sloane Avenue and Victoria Park Avenue

Last Updated: January 14, 2019

WHAT WORK IS TAKING PLACE?

As part of utility relocations, road widening and road reconstruction along Eglinton Avenue East between Sloane Avenue and Victoria Park Avenue, new traffic staging (depicted below) will be implemented as early as January 15, 2019. This traffic configuration will be in place for up to four (4) weeks.

All works are in support of the construction of the Crosstown LRT tracks and guideway (dedicated transit lane) in the centre of Eglinton Avenue East. Read more »

December 062018

Updated: Road Reconstruction at Credit Union

Last Updated: February 5, 2019

WHAT WORK IS TAKING PLACE?

Crews will be conducting roadway surface reconstruction approaching and within the Swift and Credit Union Drive intersection along Eglinton Avenue East. Work will begin as early as November 21, 2018 on the south side of Eglinton at Credit Union Drive and then shift to the north side of Eglinton Avenue East at Swift Drive late-February, 2019. A separate notice will be issued for the closure of Swift Drive.   Read more »

November 142018

Eastern Works Open House (Science Centre Station and Sunnybrook Park Stop to O'Connor Stop)

Thank you for attending the open house about Science Centre Station and Sunnybrook Park Stop to O'Connor Stop on November 13, 2018. For those of you who missed it, the presentation is here:

Read more »

November 132018

Road Reconstruction at Credit Union and Swift Drive

What Work is Taking Place?

Crews will be conducting roadway surface reconstruction approaching and within the Swift and Credit Union Drive intersection along Eglinton Avenue East. The reconstruction follows the completion of utilities work in this area. Read more »

November 062018

Update: Wilson Brook Culvert Works East of Sloane

What Work is Taking Place?

Due to variable weather conditions and to support the continued progress on the Wilson Brook Culvert works, a generator will be onsite to operate a water pumping system to remove accumulated precipitation from the construction zone. It may run continuously, including overnight between 11 p.m. and 7 a.m. for the next 4-6 weeks as required based on weather conditions. Read more »

November 052018

Extended: Watermain, Storm, and Sanitary Relocation at Eglinton Avenue East and Swift Drive Intersection

What Work is Taking Place?

As part of the construction of the future surface area stops, crews continue to upgrade and relocate wet utilities along Eglinton Avenue East between Credit Union Drive and Swift Drive.

In an effort to minimize disruption and to protect the safety of the local community and commuters, work will be performed overnight beginning as early as Monday, October 22nd, 2018 and last until the end of November 2018. Read more »