Bermondsey Road
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street

EXTENDED CONSTRUCTION HOURS WEST DON RIVER BRIDGE TO VICTORIA PARK AVENUE
EXTENDED CONSTRUCTION HOURS
WEST DON RIVER BRIDGE TO VICTORIA PARK AVENUE Read more »
GUIDEWAY CONSTRUCTION CONTINUES EAST OF SLOANE AVENUE
GUIDEWAY CONSTRUCTION CONTINUES EAST OF SLOANE AVENUE
WHAT WORK IS TAKING PLACE? Read more »
Eastern Works Open House
Thank you for attending the Easterm Works Open House on October 24, 2019. For those of you who missed it, the presentation is here:
EARLY MORNING START FOR GUIDEWAY EXCAVATION ON EGLINTON AVENUE EAST: EAST DON RIVER BRIDGE TO SWIFT DRIVE
UPDATED: OCTOBER 29, 2019
UPDATED: NOVEMBER 7, 2019 Read more »
CONCRETE POURS ON EGLINTON AVENUE EAST SWIFT DRIVE TO SLOANE AVENUE
CONCRETE POURS ON EGLINTON AVENUE EAST Read more »
CONCRETE POUR WEST OF SLOANE ON EGLINTON AVENUE EAST
CONCRETE POUR WEST OF SLOANE ON EGLINTON AVENUE EAST
WHAT WORK IS TAKING PLACE? Read more »
Overnight Line Painting on Eglinton Avenue East Between Swift Drive and Sloane Avenue
Overnight Line Painting on Eglinton Avenue East Between Swift Drive and Sloane Avenue
WHAT WORK IS TAKING PLACE? Read more »
GUIDEWAY CONSTRUCTION ENDS AT CREDIT UNION-SWIFT
GUIDEWAY CONSTRUCTION BETWEEN SLOANE AVENUE AND JONESVILLE CRESCENT
WHAT WORK IS TAKING PLACE?
Guideway construction will commence east of the future Sloane stop as early as October 14, 2019. Traffic will remain in this configuration (depicted below) for approximately six (6) months. Construction at the Wilson Brook Culvert will also continue. Crews are building a temporary storm drain line, as well as excavating and replacing the storm water culvert under Eglinton Ave East. The culvert work is located on the north side of Eglinton Avenue East between Sloane Avenue and Jonesville Crescent.
Temporary Crosswalk Closure at Credit Union and Swift Drive
WHAT WORK IS TAKING PLACE? Read more »