Bayview Avenue

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

Syndicate content
 
December 192019

ROAD REINSTATEMENT AT EMERGENCY EXIT 3

ROAD REINSTATEMENT AT EMERGENCY EXIT 3  

(Eglinton Ave E and Donlea Dr.) Read more »

December 182019

Decking Repair and Concrete Pour at Leaside Station

 

Decking Repair and Concrete Pour at Leaside Station Read more »

Categories:
December 132019
December 062019

UPDATE: TRAFFIC CONFIGURATION CHANGE Emergency Exit 3 – Eglinton and Donlea

TRAFFIC CONFIGURATION CHANGE

Emergency Exit 3 – Eglinton and Donlea Read more »

December 042019
December 022019

Decking Repair Continues at Leaside Station

 

Decking Repair Continues at Leaside Station Read more »

Categories:
November 242019

Decking Repair and Concrete Pour at Leaside Station

 

Decking Repair and Concrete Pour at Leaside Station

  Read more »

Categories:
November 112019

Decking Repair Continues at Leaside Station

 

Decking Repair Continues at Leaside Station Read more »

Categories:
November 052019

Dewatering Works at Howard Talbot Park

 

Dewatering Works at Howard Talbot Park Read more »

Categories: