Pharmacy Avenue
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street

Nightly Crosswalk Closure at Pharmacy Avenue and Eglinton to Facilitate Watermain Installation
What Work is Taking Place?
As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be closing the east side crosswalk (north-south) at Pharmacy Avenue and Eglinton Avenue East intersection as early as Monday, November 19, 2018 for approximately four (4) nights. Lire la suite »
Crosswalk Closure at Pharmacy Avenue and Eglinton Avenue East to Facilitate Catch Basin Installation
What Work is Taking Place?
As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be closing the west side crosswalk (north-south) at Pharmacy Avenue and Eglinton Avenue East intersection as early as Monday, November 19, 2018 for approximately five (5) weeks.
The closure is required to provide safe and adequate space for catch basin installation and boulevard work. Lire la suite »
Guideway Work along Surface Section of the Eglinton Crosstown LRT: Victoria Park Avenue to Pharmacy Avenue
What Work is Taking Place?
As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting guideway work in the center of Eglinton Avenue East between Victoria Park Avenue and Pharmacy Avenue starting as early as November 24, 2018 until early 2019. The work includes cutting and removal of existing asphalt, excavation, installation of subgrade materials, duct banks installation and track drainage, track slab and stops.
Stage 2: Lire la suite »
Extended: Rolling Sidewalk Closures for Civil Road Work from Victoria Park Avenue to Pharmacy Avenue
What Work is Taking Place?
In support of construction of the future At Grade stops, crews continue civil works in relation to road widening works on both the north and south sides of Eglinton Avenue East between Victoria Park Avenue and Pharmacy Avenue. Work began in mid-September 2018.
Work has been extended until Friday, November 30, 2018. Lire la suite »
Extended: Telecommunication Relocation Work between Victoria Park Avenue and Birchmount Road
What Work is Taking Place?
Crews will continue to relocate and upgrade existing overhead and underground telecommunication between Victoria Park Avenue and Birchmount Road, as part of construction of the future surface section for the Eglinton Crosstown LRT.
Telecom work commenced in February and has been extended until the end of the year (Fall/Winter 2018).
Pharmacy to Kennedy Construction Liaison Committee Meeting
The construction liaison committee meeting of Pharmacy to Kennedy was held on October 30, 2018. You can see the presentation here:
Pharmacy to Kennedy Construction Liaison Committee Meeting
The construction liaison committee meeting of Pharmacy to Kennedy was held on September 25, 2018. You can see the presentation here:
Update: New Traffic Changes from Victoria Park Avenue to Birchmount Road to Support Surface Section Work
What Work is Taking Place?
As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting traffic changes in order to accommodate road widening, upgrading and relocating wet utilities and dry utilities along Victoria Park Avenue to Birchmount Road starting as early as Friday, September 21st.
Preparatory work for the reconfiguration will take place as early as Friday, September 21, 2018 starting at 7:00 PM and ending Monday, September 24, 2018 at 6:00 AM. Lire la suite »
New Traffic Changes from Victoria Park Avenue to Birchmount Road to Support Surface Section Work
Originally Published: September 14, 2018
Updated: September 17, 2018
As work intensifies along the surface portion of the Eglinton Crosstown Light Rail Transit Project in preparation for guideway construction, there will be some major changes.
Expect to see new traffic changes between Victoria Park and Birchmount beginning less than a week from today — as early as Friday, September 21, 2018. Lire la suite »
Rolling Sidewalk Closures for Civil Road Work from Victoria Park Avenue to Pharmacy Road
Originally Published: September 13, 2018
Last Updated: December 14, 2018
What Work is Taking Place?
In support of construction of the future At Grade stops, crews will be conducting civil works in relation to Road Widening works on both the north and south sides of Eglinton Avenue East between Victoria Park Avenue and Pharmacy Avenue. Lire la suite »