Brentcliffe Road

À la recherche de nouvelles concernant des travaux près d’une i

Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.

Syndiquer le contenu
 
novembre 152017

Science Centre Station and West At-Grade (Sunnybrook Park Stop to O'Connor Stop) Open House

Thank you for attending the open house about Science Centre Station and West At-Grade (Sunnybrook Park Stop to O'Connor Stop) on November 14, 2017.  Lire la suite »

novembre 142017

Rescheduled: Overnight Sanitary Sewer Relocation for Brentcliffe Portal

Eglinton Avenue East Lane Closure between Brentcliffe Road and Leslie Street Starting Friday, December 1 at 9:00 p.m.

What Work is Taking Place?

Crews will relocate an existing sanitary sewer line on Eglinton Avenue East between Brentcliffe Road and Leslie Street to support the upgrade of existing infrastructure at the future Brentcliffe Portal and Sunnybrook Park Stop. Lire la suite »

novembre 132017

Update: Geotechnical Equipment Installations and Monitoring on Thursfield Crescent for the Brentcliffe Portal and Surface Stops

What Work is Taking Place?

As part of the ongoing construction works for the future Brentcliffe Portal and Surface Stops, above ground and in-ground monitoring points will be installed on the City Right-of-Way, which may include the roadway, sidewalks and/or driveways on Thursfield Crescent.

Once installed, the instruments will remain at these locations for the length of the project. Monitoring allows crews to evaluate the impact of construction works. Lire la suite »

novembre 082017

Update: Overnight Sanitary Sewer Relocation for Brentcliffe Portal

Eglinton Avenue East Lane Closure between Brentcliffe Road and Leslie Street Starting Friday, November 17 at 9:00 p.m.

What Work is Taking Place?

Crews will relocate an existing sanitary sewer line on Eglinton Avenue East between Brentcliffe Road and Leslie Street to support the upgrade of existing infrastructure at the future Brentcliffe Portal and Sunnybrook Park Stop. Lire la suite »

novembre 032017

Brentcliffe - Victoria Park Construction Liaison Committee Meeting

The construction liaison committee meeting of Brentcliffe - Victoria Park was held on November 2, 2017. You can see the presentation here:

Lire la suite »

octobre 302017

Toronto Hydro-Electric System Limited (THESL) and Telecommunication Relocations (Brentcliffe to Leslie)

What Work is Taking Place?

Crews will relocate and upgrade existing overhead and underground telecommunication and hydro utilities between Brentcliffe Road and Leslie Street along Eglinton Ave East in preparation for construction of the Brentcliffe Portal and Sunnybrook Park Stop. Lire la suite »

octobre 242017

Overnight Sanitary Sewer Relocation for Brentcliffe Portal

What Work is Taking Place?

Crews will relocate an existing sanitary sewer line on Eglinton Avenue East between Brentcliffe Road and Leslie Street to support the upgrade of existing infrastructure at the future Brentcliffe Portal and Sunnybrook Park Stop. 

To minimize traffic disruption for the community, transit users and local businesses, this work is being done overnight. Paid Duty Police Officers will maintain safe traffic flow. Lire la suite »

octobre 162017

Early Morning Concrete Pour at Brentcliffe Portal

What Work is Taking Place?

Crews will be pouring the concrete foundation for the Brentcliffe Portal.  Work will be conducted within the existing work zone located on Eglinton Avenue East between Brentcliffe Road and Leslie Street. Due to the large size of these concrete pours, work will start at 5:00 a.m. in order to complete the pour during daytime hours, reducing impact to traffic in the area. Lire la suite »

octobre 062017

Brentcliffe - Victoria Park Construction Liaison Committee Meeting

The construction liaison committee meeting of Brentcliffe - Victoria Park was held on October 5, 2017. You can see the presentation here:

Lire la suite »

octobre 052017

Tunnel Backfilling Brentcliffe Road to Laird Drive

What Work is Taking Place?

To support the ongoing mining works at the future Laird Station, a layer of backfill (granular material) will be added to the base of the existing tunnel from the Brentcliffe Portal to Laird Drive. 

Backfill material will be stockpiled and then be pushed in to the tunnel at Brentcliffe Portal and inside the tunnels towards Laird Drive. Compaction of the material will occur inside of the tunnels. Lire la suite »