Brentcliffe Road
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street

Brentcliffe - Victoria Park Construction Liaison Committee Meeting
The construction liaison committee meeting of Brentcliffe - Victoria Park for October 4, 2018. You can see the presentation here:
Green Wall Construction Continues at the E.T. Seton Park
What Work is Taking Place?
As part of the continued construction of the future Sunnybrook Park Stop, crews will continue construction of a green wall (retaining wall) at the E.T. Seton Park along the south side of Eglinton Avenue East at Leslie Street intersection as part of the construction of the Eglinton Crosstown LRT. Lire la suite »
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
The construction liaison committee meeting of Brentcliffe - Victoria Park for June 14, 2018. You can see the presentation here:
Early Morning Concrete Pours at Brentcliffe Portal: June 12, 2018
What Work is Taking Place?
Crews will be pouring concrete to continue building the roof slabs for the Brentcliffe Portal. Work will be conducted within the existing work zone located on Eglinton Avenue East between Brentcliffe Road and Leslie Street. Lire la suite »
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
The presentation for the construction liaison committee meeting of Brentcliffe - Victoria Park for the month of May 2018 can be viewed here:
Sheet Piling Work at the Brentcliffe Portal
What Work is Taking Place?
Crews will be driving sheet piles as part of the Support of Excavation at the Brentcliffe Portal at the eastern end of the existing work zone, beginning as early as April 17, 2018. Lire la suite »
Brentcliffe - Vctoria Park Construction Liaison Committee Meeting
The construction liaison committee meeting of Brentcliffe - Victoria Park was held on April 5, 2018. You can see the presentation here:
Central-East Open House (Laird Station to West At-Grade (Sunnybrook - O'Connor Stops)
Thank you for attending the open house about Laird Station to West At-Grade (Sunnybrook - O'Connor Stops) on March 28, 2018.
For those of you who missed it, the presentation is here: Lire la suite »
Clearing, Grubbing, and Pruning between Don Avon Drive to Victoria Park Avenue in Preparation for Construction of Surface Stops
As our constructors get ready to ramp up construction activity at the surface section of the Eglinton Crosstown LRT project, clearing, grubbing, and pruning and protection activity continues as part of preparatory work. This activity commenced two years ago and is done on an ongoing, as-needed basis to support the construction of the Eglinton Crosstown Light Rail Transit Project (ECLRT). All works will be carried out with the approvals and cooperation of the responsible authority. Lire la suite »
Hydro Utility Relocation Relocations (Brentcliffe to Leslie)
What Work is Taking Place?
To prepare for the construction of the surface section and future road widening, beginning as early as late-March 2018, crews will relocate and upgrade existing overhead hydro utilities between Brentcliffe Rd and Leslie Street. Existing overhead and underground infrastructure will be relocated for construction and staging purposes.
Outages will be required to switch services to the new infrastructure. Outage requirements and impacts will be communicated separately only to those directly impacted. Lire la suite »