Birchmount Road
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street

Pharmacy - Kennedy Construction Liaison Committee Meeting
The construction liaison committee meeting of stops and station between Pharmacy and Kennedy was held on February 27, 2018. You can see the presentation here:
Resumption of Telecommunication Utilities Relocation: Eglinton Square to Birchmount Road
What Work is Taking Place?
- Crews will resume the relocation of existing telecommunication lines along Eglinton Avenue East, between Victoria Park Avenue and Birchmount Road.
- Telecommunication lines within utility chambers as well within pre-existing duct banks will be relocated in preparation for surface stop construction.
Hours of Work
- Work began late October 2017 and will begin again a
Pharmacy - Kennedy Construction Liaison Committee Meeting
The construction liaison committee meeting of stops and station between Pharmacy and Kennedy was held on January 30, 2018. You can see the presentation here:
Watermain, Storm and Sanitary Relocation at Kennedy Station
What Work is Taking Place?
As part of construction of the future Kennedy Station, crews will be upgrading and relocating wet utilities along Eglinton Avenue between east of Kennedy Road to west of Midland Avenue, including the North Service Road. Lire la suite »
East At-Grade (Pharmacy Stop to Ionview Stop) and Kennedy Station Open House
Thank you for attending the open house about Kennedy Station and East At-Grade (Pharmacy Stop to Ionview Stop) on December 5, 2017.
For those of you who missed it, the presentation is here: Lire la suite »
Installation of Temporary Traffic Signals Across Eglinton Avenue East Between Leslie Street and Kennedy Road
Updated: November 6, 2017
Original Post: October 20, 2017
What Work is Taking Place?
Crews will remove existing traffic signals and install temporary traffic signals on Eglinton Avenue East between Leslie Street and Kennedy Road, to make way for the construction of future surface stops for the Eglinton Crosstown LRT.
Timing Lire la suite »
Changes to the Driveways at 2360 Eglinton Avenue East: Stage 1
In Support of Upgrades to Water Infrastructure for the Eastern End of the Eglinton Crosstown LRT Line
Beginning as early as Monday, November 6, 2017 for approximately four (4) weeks, driveways at 2360 Eglinton Avenue East will be modified to support construction of the Crosstown LRT. Work will be done in two stages, each stage lasting approximately two (2) weeks.
Please see image below showing changes to access to 2360 Eglinton Avenue East during Stage 1 of this work.
What Work is Taking Place? Lire la suite »
Installation of Temporary Traffic Signals Across Eglinton Avenue East Between Leslie Street and Kennedy Road
What Work is Taking Place?
Crews will remove existing traffic signals and install temporary traffic signals on Eglinton Avenue East between Leslie Street and Kennedy Road, to make way for the construction of future surface stops for the Eglinton Crosstown LRT.
Timing Lire la suite »
UPDATED: Ongoing Preparatory Works between Leslie and Midland: Street Furniture Removals
Updated: September 28, 2017
Original Issue Date: May 10, 2017
What Work is Taking Place?
As part of ongoing preparatory works, crews will begin the process of removing street furniture across the Eglinton Avenue East corridor between Leslie Street and Midland Avenue. Lire la suite »